Client | 
Project | 
Description | 
Scope of
Work | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 5, Jakob Kaiser Platz
underground station | 
Reconstruction of the tracks on the line | 
Inventory, determining the track geometry,
staking out | 
  | 
|   | 
HOCHTIEF | 
S-Bahn railway connecting-curve Neukölln | 
Completion and replacement of civil engineering
structures, Lot 1 and Lot 5 | 
Comprehensive supervision offive bridge
construction projects | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 5,  Schillingstraße
station | 
Reconstruction of the tracks on the line | 
Inventory, determining the track geometry,
staking out | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 5,  stations:
Frankfurter Tor and Samariter Straße | 
Reconstruction of the tracks on the line | 
Inventory, determining the track geometry,
staking out | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 7, 
Rudow station | 
Measure of reorganization and building, 
Installation of a double track connection | 
Inventory, determining the track geometry and track connections,
staking out,  marking out | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 5,  Samariter Straße
station | 
Repair and 
obstruct-fair development | 
Inventory, determining the track geometry,
staking out | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 1, stations
Möckernbrücke 
and Hallesches Tor | 
Height control
at building rise 
 | 
Production measuring concept, Control
measurements and documentation | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 5, Magdalenenstraße
station | 
Repair of the station | 
Inventory, determining the track geometry | 
  | 
|   | 
Berliner Verkehrsbetriebe 
(BVG) | 
Underground Line 7, Wilmersdorfer
Straße station | 
Elevator
installation | 
Local inventory in two levels,
longitudinal and transverse profiles | 
  | 
|   | 
Bleck & Söhne  | 
Underground Line 7,  Johannisthaler
Chaussee station | 
Surface
reconstruction of the platform 
 | 
staking out, 
control measurements  | 
  | 
|   | 
Lindner AG  | 
Underground Line 5, 
Magdalenenstraße station | 
Measurement of the background track walls | 
Raster stocktaking and evaluation related to a
basis level | 
  | 
|   | 
Wolgang Bauer 
Ingenieurbau GmbH  | 
Underground Line 5, 
Frankfurter Allee station | 
Reconstruction of the tracks on the line | 
Control Measurement, 
Staking out of the tracks | 
  | 
|   | 
Wolfgang Bauer 
Ingenieurbau GmbH  | 
Underground Line 9, Osloer Straße
station | 
Repair and obstruct-fair development | 
Inventory, determining the track geometry,
staking out, control measurements | 
  | 
|   | 
Bleck & Söhne  | 
Underground station  
Alexanderplatz | 
Basic repair western intermediate level | 
Measurement achievements for the soil
adjustment | 
  | 
|   | 
Bleck & Söhne  | 
Underground Line 6, 
Alt-Tegel station | 
Elevator
installation  | 
Staking
out, 
Measurement
 | 
  |