GPS
survey of approx. fourty grid points forming a local grid
for evidentiary documentation and site survey in the grid
42/83. |
|
|
 |
Combined GPS
and (TCA-2003) tacheometric survey, creating a local building-related
grid for evidentiary documentation. |
|
|
 |
For each building
complex at least four horizontal and vertical points will
be established, providing a basis for the points to be observed. |
|
|
 |
The evaluation
and precise examination of the above surveys will be carried
out using PANDA equalisation software, permitting transfer
of the original data. |
|
|
 |
Levelling across
the entire project area. |
|
|
 |
Making
gradient measurements with a clinometer specially developed
for monitoring buildings. Console mounts are attached, making
it possible to combine tacheometric surveying with the relative
measuring method and to work with a centred base. |